- 23 Nov, 2013 1 commit
-
-
Liam M. Healy authored
As an interim step in separation of systems, physical-dimension is now loadable if grid is loaded. All grid tests pass. However, there are failures basic Antik functions and tests are not properly loaded.
-
- 09 Mar, 2013 3 commits
-
-
Liam M. Healy authored
-
Liam M. Healy authored
-
Liam M. Healy authored
New systems grid, antik-base which load by themselves, and grid tests run if lisp-unit is loaded. The physical-dimension system gets an error on load.
-